An emergency 80-megawatt barge procured by a consortium of mining companies has arrived at the Tema Port as part of efforts to beef up energy requirements due to depleting water levels in the Akosombo Dam.It would be providing power in three months during which Newmont engineers would install and test the facility to meet expected capacities.The consortium led by Newmont Ghana Gold Limited includes Gold Fields Ghana, AngloGold Ashanti and Gold Star Resources. The barge would be located at the New Tema VRA Sub-Station near the Tema Oil Refinery.Briefing journalists at the Tema Port, Mr Joshua Mutoti, Newmont's Energy Manager, said the 45 million-dollar barge is the consortium's contribution to stabilizing the power rationing programme.
The Volta River Authority (VRA) embarked on a power-rationing programme last August following depleting water resources of the Akosombo Dam, which is currently at 237.60 feet, far below the minimum operating level of 240 feet.The Akosombo Dam started commercial production of electricity in 1965.
GNA

a rematch of the 2006 World Cup second-round tie which Brazil won 3-0 but Julio Cesar was their most important player.He made his first notable save in the 15th minute when he tipped away Eric Addo's close-range header.
Appiah and midfielder Michael Essien, Ghana continued to threaten the South Americans in a surprisingly slow-paced game.
e happy to threaten on the break and created a clear opening in the 65th minute which was wasted by Kaka, who toe-poked the ball wide.Ghana had midfielder Haminu Dramani sent off for a second bookable offence in the 77th minute, after which the game fizzled out with Brazil happy to sit back on their lead.
